The existing ZNA area (Central Emergency Department) will be rebuilt and expanded. The conversion takes place in 2 construction phases.
Connection BA1 and BA2 to GHV Nord
- approx. 450m cable route / channel incl. moulded and fastening parts
- approx. 1000 collection holders for false ceiling areas with low installation height
- approx. 3200m cable (E0 and E90) in cross-sections from 25mm² to 120mm²
- Fire bulkheads and core drilling