Since 2016, the Musik- und Kongresshalle (MuK) has been renovated in several construction phases.
As part of the current construction phase 2.9 kitchen cubes, the commercial kitchen of MuK, including the adjacent areas, will be gutted and rebuilt.
The suspended outer ceiling is to be finished with a finishing plaster. In addition, it is necessary to coat suspended ceilings and drywall in the interior. In addition, interior renovation coatings are to be carried out on reinforced concrete & plaster walls and ceilings. In the basement, floor surfaces are to be coated.
Ceiling outside:
— 675 m
— 675 m
— 675 m
Ceiling areas:
— 250 m
— 150 m
— spatula 150 m
— 150 m
— 250 m
Wall surfaces:
— 800 m
— 800 m
Floor areas:
— 300 m
— 300 m
— 300 m
— 300 m
other:
— coat 44 steel frames,
— coat 30 steel sheet doors.