Carpentry work on the 3rd construction phase during the general renovation of a grammar school
Carpentry work for the general renovation of a grammar school.
Gross Spatial Content (BRI) BA III:
(after refurbishment)
BT B (incl. connecting gear): 9,841.40m³
BT E: 7,258.70m³
Generally:
The Münsterschwarzach Abbey intends to renovate the Egbert grammar school. The renovation includes the Components AG. The
Adjacent gymnasiums are not part of the renovation measure. The scope of the contract concerns the 3rd construction phase, which covers component B and
E concerns.
Main positions:
- approx. 140m² wall cladding in the grandstand area
- 4 pcs manufacture and integration of fire extinguishing boxes in wall cladding
- approx. 15m Manufacture of door frames within wall cladding
- approx. 13m² wall cladding stage
- approx. 2m² wall cladding stage (in the stair area)
- approx. 17m New upper end strip stage, solid wood
- approx. 14m² wall cladding side entrances stage
- 1 pc built-in furniture signal box
- 1 pc built-in furniture sales counter (fire protection requirement B1)