Construction of an elevator.
Site installation, tubular scaffolding, removal and neutralization of radiator, removal of RIA, removal of inner door block, removal of shelving, demolition of smoke extraction duct, demolition of solid slab of 16 cm thick temporary door, modification existing opening, creation opening, opening opening, crawl space cleaning, acroterium head demolition, channel or hand hole excavation, concrete concrete, footing concrete, foundation footings, solid slab block walls bancher, concrete for beams, formwork for beams, reinforcement for acroterium beams, single-layer plaster, ventilation grille for VH, elevator, cf. details in the CCTP.
Watertight casing, partial removal of the self-mounted bodyguard, existing partial sealing, anchor hook, self-protected insulated sealing for non-accessible terrace, insulated sealing test, sealing with insulation, lacquered aluminum cover, overflow for elastomeric sealing, installation and adaptation of the self-mounted guard, guard anodised aluminum, cf. details in the CCTP.
Removal of PVC floor covering, plasterboard coating, vertical smoke extraction duct, horizontal smoke extraction duct, cuff for frame, smoke damper, front air intake grille, removable acoustic ceiling, gypsum plaster in connection with works preparatory work on old backdrops, glass-to-paint coating, painting on existing joinery, acoustic floor covering baseboard, wall protection, corner protection, fire extinguisher movement retouching - connections - cleaning, cleaning at the end of construction, cf . details in the CCTP.
Site installation neutralization and removal of the electrical installation power supply of the elevator in strong and weak current non-stop elevator detector to move plateau Led with detection detection control smoke extraction rearming smoke evacuation flaps cf details in the CCTP.
Lift 1,275 kg, 17 people, cf. details in the CCTP.