The construction project of line 302 includes the construction phase between
Watermann's way. to the stop Lohrheidstr.
The construction phase extends over approx. 650m.
The construction project extends over two separate construction phases
BA1 from Watermanns Weg to Hollandstr.- BA2 from Hollandstr. to bus stop
Lohrheidestr.
In both construction phases, the new catenary system must be connected to the
Existing catenary system can be adapted.
On the outer masts, transverse spans as well as double-track booms are installed for a
track and mounted for two tracks. The production as well as the delivery of the masts
are part of this call for proposals. The contractor has the task of
Delivery of the masts to the construction site in consultation with the client as well as with
to tune and coordinate with the producer of the masts.
The construction project of line 302 includes the construction phase between
Watermann's way. to the stop Lohrheidstr.
The construction phase extends over approx. 650m.
The construction project extends over two separate construction phases
BA1 from Watermanns Weg to Hollandstr.- BA2 from Hollandstr. to bus stop
Lohrheidestr.
In both construction phases, the new catenary system must be connected to the
Existing catenary system can be adapted.
On the outer masts, transverse spans as well as double-track booms are installed for a
track and mounted for two tracks. The production as well as the delivery of the masts
are part of this call for proposals. The contractor has the task of
Delivery of the masts to the construction site in consultation with the client as well as with
to tune and coordinate with the producer of the masts.