70-00001-2720-02 Earthworks and shoring works
“* Dates for performing the main performance on the construction site:
Leistungsbeginn 15.01.2024; Leistungsende 25.10.2024
* Description of the procurement:
Execution of earthworks with BE for own purposes
- approx. 20,000 m³ of excavated earth and disposal
- approx. 440 sqm shoring, partly with reverse anchoring
- Setting up and operating water drainage as open water drainage"