Preparation of a construction plan, tender documentation, work drawing and follow-up in the construction period for the E6 Sørfold tunnels. Lot: Sommerset-Tverrdalen.
The consultant shall have a well-knit engineering design team with the necessary expertise in suspension bridge design, road design, tunnel design, bridge and construction design, electro (electro, radio, tele and automation), water and sewage, geotechnics, geology, noise, architecture, landscape architecture, environment etc.