The 2 Bauhauptgewerk
earthworks:
approx. 105m³ Gründungspolster
ca. 170m³ Ramp Tiefgaragenzufahrt
Drainage works:
Install approx. 62m KG cables
2 Pumpensümpfe
Concrete and reinforced concrete work:
approx. 1,300m² base plate d=50cm
approx. 890m² Hohlwände
8 St. Fertigteiltreppen
approx. 3.450m² Stahlbetondecken
14 pcs. balcony slabs as prefabricated parts
Various number of truss columns or beams
Install approx. 214t of reinforcing steel
Make 1 piece of elevator shaft (d=24cm)
Masonry:
approx. 4,260m² interior and exterior masonry in undert. Producing masonry thicknesses
approx. 1,530m of KS chinees in different thicknesses
Various masonry work during construction (U-shells, closing openings, etc.)
Lightning protection and earthing systems:
approx. 670m strip steel in stainless steel or galvanized
approx. 120 pcs various connectors