As part of the refurbishment of the Music and Congress Hall (MuK), the installed sanitary and heating technology is to be largely rebuilt within the kitchen cube in construction phase 2.9.
Sanitary engineering:
— dismantling of wastewater plastic/SML: approx. 50 lfdm,
— dismantling of drinking water pipe, copper steel/steel: approx. 440 lfdm,
— New installation of sewage pipe plastic/SML DN 50-100: approx. 120 fdm,
— Reinstallation of GL dewatering SML DN50-100: approx. 80 lfdm,
— Stainless steel floor drains: 7 pcs.
— drainage channel, heavy duty 4.5 lfmd.: 1 pc.
— New installation of stainless steel drinking water pipeline/multi-layer composite pipe DN 12-DN32: approx. 550 lfdm,
— Fresh water station incl. accessories, 300l buffer tank: 1 pc.
— Freeze-WC: 2 pc (s), Washbasin: 2 pcs, Urinal: 1 pc (s), Shower: 2 pc (s), Sink: 1 pc (s),
— Heating technology: dismantling pipeline steel, copper: approx. 200 lfdm,
— dismantling radiators: approx. 4 pcs.
— dismantling 1 000 l WWB: 1 pc.
— Circulation pump replacement: 6 pcs.
— New installation of heating pipe carbon steel DN 12-40: approx. 500 lfdm,
— Towel radiators: 2 pcs., Flat valve radiators: 1 pc., vert. Heating wall: 2 pcs.