Installation of water and sewage systems, water treatment, shower systems, gas system, sanitary equipment
Sanitäranlage LOS 2 BT A-D
Type and scope of the object of the order:
The construction project involves the renovation, modernization and expansion of the wish spa in Winnenden.
Here especially the LOS 2 for the component A-D main building and course pool
Main building Renovation and extension: Two-storey and partial basement
New course pool: single-storey with basement
Wastewater and rainwater
• Approx. 700 m highly sound-insulated sewage pipe PE D 56 – 160 incl. fittings and fittings and fire protection
• Approx. 100 m sound-optimized drainage system with plug-in sleeve
From DN 50 – DN 125 incl. fittings and fittings and fire protection
• Approx. 115 floor drains DN 70 & 100
• Approx. 13 drainage channels V4A from 2.2 m – 24 m
• Approx. 170 m hot-dip galvanized dewatering steel pipe DN 100 – DN 125 incl. fittings and fittings for rain drainage
Drinking water
• Approx. 1,400 m drinking water pipe PE-100 DN 25-125 incl. fittings and fittings, fire protection and insulation
• Approx. 2,000 m drinking water pipe multilayer composite 100 DN 12-50 incl. fittings and fittings, fire protection and insulation
• Div. Trinkwasserarmaturen
• Ca. 16 Hygienespülstationen
• 1 demineralized water system, 1 pressure booster system
• Approx. 3 disabled toilets incl. installation elements and accessories
• Approx. 17 toilets incl. installation elements and accessories, zus. Urinals and washbasins
• Several row shower systems with 44 showerheads in total
• Ca. 6 Erlebnisduschen
Gas systems
• Approx. 250 m gas pipe stainless steel DN 15-65 incl. fittings and fittings
• Various gas fittings and meters
Performance dates:
Execution period: April 2023 to May 2024
Completion of new opening 01.06.2024