Brabeckstrasse 2nd BA; Road construction
Remodeling.
- Pick up and dispose of or store 3,931 m of concrete curbs,
- 742 m 2nd Pick up and dispose of gutters,
- 5 797 m 2nd Pick up and dispose of or store pavement and slab coverings,
- 7 397 m 2nd Pick up and dispose of bituminous fastening,
- 5 576 m 3rd Carry out earthworks,
- Pick up 1 196 t of soil> Z2 and load it in containers of the AG,
- Lay 1,760 m of empty pipes,
—4,061 m deliver and install concrete curbs,
- 742 m 2nd Making concrete castings,
- 17 397 m 2nd Create an anti-freeze layer,
- 15,924 m 2nd Create gravel base layers
- 4 100 m 2nd Make asphalt road,
- 11,554 m 2nd Create slab and paving surfaces.