Development of design documentation for the reconstruction of the gas network - 5 Tasks
Task 1 – Zgierz, Ossowskiego StreetPreparation of design documentation for the reconstruction of the gas pipeline with connections in Zgierz, Ossowskiego, Majakowskiego, Kołłątaja, Kunickiego, Sienkiewicza, Rembilińskiego streets in accordance with technical conditions no. PSGLO/ZMDZ/ZMSM/142/2022/G/P
- medium pressure PE 160 mm gas pipeline with length L = approx. 396 m
- medium pressure PE gas pipeline 125 mm with length L = approx. 641 m
- medium pressure gas pipeline PE 63 mm with length L = approx. 658 m
- gas connections PE DN25 pcs. 80 including connection to the existing gas installation located in the buildings
- switching of existing PE DN25 connections 16
Task 2 – Łódź, Bartoka StreetDevelopment of design documentation for the reconstruction of the gas pipeline with connections in the m. Bartoka, Czernika, Adwentowicza in accordance with the Technical Conditions no. PSGLO/ZMDZ/ZMSM/115/2022/G/P
- low pressure gas pipeline PE 90 mm with length L = approx. 165 m
- low pressure gas pipeline PE 110 mm with length L = approx. 205 m
- low pressure gas pipeline PE 160 mm with length L = approx. 1876 m
- low pressure gas pipeline PE 250 mm with length L = approx. 598 m
- gas connections PE DN40/90 pcs. 35 including connection to the existing gas installation located in the buildings
- switching of existing pc connections. 37
Task 3 – Łódź, Podhalańska StreetPreparation of design documentation for the reconstruction of the gas pipeline with connections in Łódź, Podhalańska Street in accordance with the Technical Conditions no. PSGLO/ZMDZ/ZMSM/120/2022/G/P
- low pressure gas pipeline PE 160 mm with length L = approx. 97 m
- gas connections PE DN40 pcs. 3 including connection to the existing gas installation located in the buildings
Task 4 – Łódź, Niska StreetPreparation of design documentation for the reconstruction of the gas pipeline with connections in Łódź, Niska Street in accordance with the Technical Conditions No. PSGLO/ZMDZ/ZMSM/119/2022/G/P
- low pressure gas pipeline PE 160 mm with length L = approx. 177 m
- gas connections PE DN90 pcs. 11 including connection to the existing gas installation located in the buildings
- switching of existing pc connections. 1
Task 5 – Łódź, Poznańska StreetPreparation of design documentation for the reconstruction of the gas pipeline in Łódź, Poznańska Street in accordance with the Technical Conditions No. SGLO/ZMDZ/ZMSM/136/2022/G/P
- low pressure gas pipeline PE 110 mm with length L = approx. 570 m
- gas connections PE DN40/63 pcs. 8 including connection to the existing gas installation located in the buildings
- switching of existing pc connections. 19