The renovation of the indoor shooting range in Charlottenburger Chaussee in Berlin is being carried out out of functional and technical necessity. The necessary expansion of the space program is carried out in modular construction on the ceiling of the shooting range in the basement. The indoor shooting range is equipped with 18/1, 18/2 and 18/3 shooting lanes. The shooting range 18/3, in the basement, undergoes only minor renovation work. Before the actual renovation work begins, the building is completely freed from harmful substances. For the most part, this is done as an early measure.
The service component is the construction of two modular structures in steel construction in frame construction.
Modular structure -BW1: length: approx. 60 m; width: approx. 14.5 m; height: approx. 3.7 m
Modulbauerk – BW 2: Length: approx. 22 m; Width: approx. 11 m; Height: approx. 3.7 m
Hauptmassen: Abfangung Modulbauwerk auf bestehendes KG: HEM 700 approx. 55 t; HEM 280 approx. 1 t; HEA 240 approx. 0.8 t; HEM 300 approx. 3 t; HEM 320 approx. 6.1 t; Korrosionsbeschichtung approx. 150 m2
Stahlbauarbeiten Lüftungsplattform: GOOD 200 ca. 5.4 t; IPE 200 ca. 1.2 t; GOOD 240 ca 3,6 t; IPE 240 ca. 1 t; GOOD 260 ca. 0.8 t; GOOD 280 ca. 2,0 t; HEB 240 ca. 9.5 t; GOOD 180 ca. 1.1 t; Korrosionsbeschichtung ca. 80 m2
Modulbauwerk BW-1: IPE 160 ca. 9,3 t ; HEB 260 ca. 6,8 t; HEB 240 ca. 10,5 t; HEB 200 ca. 4,5 t; IPE 180 ca, 5,8 t; IPE 240 ca. 0,9 t; IPE 100 ca. 5,5 t; HEA 160 ca. 21,0 t; Korrosionsbeschichtung ca. 480 m2
Modulbauwerk BW-2: IPE 160 ca. 4,5 t; HEB 220 ca. 3,5 t; HEB 200 ca. 3,9 t; HEB 160 ca. 2,1 t; IPE 180 ca, 4,0 t; IPE 240 ca. 0,7 t; IPE 100 ca. 3,6 t; HEA 160 ca. 10,5 t, Korrosionsbeschichtung ca. 220 m2