The city of Bergkamen is planning to build a new building on the site of the former castle school, including and renovating the existing building wings. The castle school is made up of different building wings from different years of construction.
The old school building is a 2-storey building with a basement at the beginning of the 20th century. This was renovated a few years ago, but is not barrier-free.
An adjacent single-storey break hall with break toilets is to be dismantled in the course of the planning and replaced by a new building. To the west of the break hall is a three-story building. The connection is via a mezzanine and is also not barrier-free. In the east was the former administration building, which had already been torn down down to the basement. The new wing is to be built at this location.
A feasibility study is already available, which should be the basis for the further planning services and the subsequent construction.
Project planning for buildings and interiors and project managementPlanning services related to the building planning as well as the planning of the interiors based on the present feasibility study and the project control.
Structural designProvision of structural planning for the new school building in coordination with the project controller.
Outdoor system planningPlanning of the outdoor facilities for the new school building in coordination with the project controller.
Planning of the technical building equipment for plant groups 1-4 and 6-8Planning of the technical building equipment of the new school building for system groups 1 to 4 and 6 to 8 in coordination with the project controller.
Planning of the technical building equipment for system group 5Planning of the technical building equipment for the new school building for system group 5 in coordination with the project controller.