Modernization and expansion of Haus Gracht
Haus Gracht is a first-generation care facility and was built around 1967
built in. After over 50 years of use, the entire complex is
in need of modernization. As part of a Europe-wide call for tenders, a first
Step the planning team put together. As a special requirement of the wearer
the modernization and expansion was formulated during ongoing operation. For this
logistical problem, a viable solution was developed and the construction project was divided into two
stages of construction divided:
In the 1st BA from May 2019 to February 2021, in the area of the aborted
connecting building a new building (extension) with 109 care places and a
Ground floor part erected with functional rooms (transverse structure in the middle, completed).
In the 2nd BA from March 2021 to December 2022, the existing building should be transferred to the
Shell construction will be dismantled, expanded by a hall and comprehensively renovated.
The subject of the tender is carpentry work 1: Interior window sills