New construction of a gas pressure control measuring system (GDRMA) as a grid coupling point between the gas network of E.DIS Netz GmbH and the distribution network of Stadtwerke Pasewalk GmbH.
The facility (GDRMA) is to be built in a walk-in building with a floor area of approx. 35m². The system is available for max. Flow rate is to be dimensioned for Vn = 2500 m3 / h. It should be noted that when the start of operation for a period not yet to be named, a capacity of 500 m3/h is taken into account. The gas pressure control and custody transfer measurement must be designed accordingly. The inlet pressure is l 0-25 bar and the outlet pressure should be 3.3 bar. The electricity connection and, if necessary, sewage connection for a condensate discharge when using condensing boilers is provided by the city of Pasewalk. The power limits are l O m outside the system in DP 25 on the input side and 2 m in DP 5 on the output side.
Technical plant with precast building.
An assembly plan must be drawn up by the contractor (bidder). The plant engineering company (possibly a subcontractor) must have a permit in accordance with DVGW worksheet G 493A for planning and production.
New construction of a gas pressure control measuring system (GDRMA) as a grid coupling point between the gas network of E.DIS Netz GmbH and the distribution network of Stadtwerke Pasewalk GmbH.
The facility (GDRMA) is to be built in a walk-in building with a floor area of approx. 35m². The system is available for max. Flow rate is to be dimensioned for Vn = 2500 m3 / h. It should be noted that when the start of operation for a period not yet to be named, a capacity of 500 m3/h is taken into account. The gas pressure control and custody transfer measurement must be designed accordingly. The inlet pressure is l 0-25 bar and the outlet pressure should be 3.3 bar. The electricity connection and, if necessary, sewage connection for a condensate discharge when using condensing boilers is provided by the city of Pasewalk. The power limits are l O m outside the system in DP 25 on the input side and 2 m in DP 5 on the output side.