The existing primary school with integrated after-school care centre in Dissenchen is designed to secure the
There is a need for school and after-school care places in the urban area. The property consists of a main house from 1965, an outbuilding from 1912 and smaller buildings with different uses (garages/warehouses). The attic of the outbuilding is rented.
In the immediate vicinity of the property there is a 110 kV high-voltage line.
Necessary premises for the school are to be created or within the
of the existing building. In order to protect the classrooms from dual use with the
In order to relieve the burden on after-school care, additional rooms must be prepared. Furthermore, the number of
existing toilets are not sufficient and must be supplemented.
The construction project will continue to be used, as school and after-school care operations will not be
can move to another location.
Based on the Guidelines for Sustainable Building of the Federal Ministry of the Interior,
for construction and homeland, aspects of economy, ecology,
Socio-cultural and functional quality as well as technical quality and
Process quality.
Among other things, the accessibility in / on the building must be checked and the construction project has to be carried out under
energy aspects with a view to the conservation of natural resources - during the construction phase as well as during the period of use.
Planning is scheduled to begin at the beginning of the first quarter of 2024 with the aim of a short
Planning phase until completion of work phase 2 (approx. end of the second quarter of 2024). The further planning phases and the realization are dependent on financing.
For the realization of this construction project, the use of subsidies is planned, which will provide a
compliance with funding guidelines and rules of practice.
The awarding of construction services (VOB services) is carried out on a small-scale basis, on a trade-by-trade basis. During the implementation phase, an on-site construction site office is available every working day.
Improvement of quality management.
It is intended to appoint a general planner with the following service profiles/plant groups:
instruct:
1. Object Planning Buildings and Interiors - HOAI, Part 3, Section 1
2. Object Planning Outdoor Facilities - HOAI, Part 3, Section 2
3. Technical Planning: Structural Design - HOAI, Part 4 Section 1
4. Technical equipment: Plant groups 1,2,3,7,8 - HOAI, Part 4, section 2
5. Technical planning for technical equipment: Plant groups 4,5,6 - HOAI, Part 4 Section 2
6. Specialist Planning: Building Physics - HOAI
7. Specialist planning for fire protection - after consultation
In each case in the work phases 1 - 9 (HOAI)
Necessary expert opinions
There will be a step-by-step commissioning. The assignment initially includes LP 1 to 2. The
further commissioning is subject to financial security. The retrieval of LP 3
Up to 9 is optionally agreed. In the event of a call-off, the client is obliged to provide the services at short notice. There is no legal entitlement to the transfer of these benefits.