Subject of the submission are the roofing works, which will be delivered and assembled between 2019 and 2020 at the different parts of the building. The scope is described in detail in the service specification LV and is reproduced here only in short form:
- Polymer bitumen waterproofing membranes approx. M
- EPS thermal insulation approx. M
- Plastic waterproofing membranes TPO approx. M
- Protective tracks approx. M
- anti-gravel layer approx
Subject of the submission are the roofing works, which will be delivered and assembled between 2019 and 2020 at the different parts of the building. The scope is described in detail in the service specification LV and is reproduced here only in short form:
- Polymer bitumen waterproofing membranes approx. M
- EPS thermal insulation approx. M
- Plastic waterproofing membranes TPO approx. M
- Protective tracks approx. M
- anti-gravel layer approx