The Department of Water and Drinking Sanitation must make investments for the renewal, improvement and creation of equipment on sanitation and drinking water facilities (pumping station, pumping stations, basins, measuring points, self-monitoring points, etc.) in order to guarantee their proper functioning and in order to integrate technical developments. This framework agreement will enable the local authority to continue its investments in this direction over the period 2024-2028
Lot 1: Work on electromechanical, metal and boilermaking equipment for drinking water and wastewater treatment facilitiesThis lot concerns the creation and modification of equipment (electromechanical, metal and boilermaking) as described in the CCTP and the BPUF for the wastewater and drinking water treatment works of the Metropolis
masonry work on drinking water and wastewater treatment structuresThis lot concerns masonry work services as described in the CCTP and the BPUF for the wastewater and drinking water treatment works of the Metropolis