B 29 Expansion of Essingen eels, here: construction phase 2
Road construction Bundestraße B 29 and drainage works:
topsoil up/removal 13,000 m³, earthworks dry/removal 110.000 m³,
asphalt foundation layer in. 52,000 m², asphalt base layer in. 52,000 m²,
Install asphalt binder 52,000 m², install asphalt surface layers 52,000 m²
Drainage duct work 5,500 m, shafts 130 pcs
paving slabs/boards/gutters 3.000 m
Road construction ramps:
asphalt foundation layer, built in 8,200 m², asphalt base layer built on 8,200 m²,
Install asphalt binder 8,200 m², install asphalt surface layers 8,200 m²
Roadbuilding OVS Schnaitberg:
Install asphalt foundation layer 400 m², install asphalt base layer 400 m²,
Install asphalt covering layers 400 m², paving/slabs/boards/gutters 50 m
Manufacture of buildings 5, 6 (BW 6: south abutment only), 6a, 7, 7a, 8, 9, 11.
All the above points are part of the BIM pilot project “B 29 Expansion Essingen Ealen, BA 2"! The processing of aWF 10 - 20 + XX must be carried out for the listed services!
Working for the municipality of Essingen and GEO:
sewer pipes/ducts approx. 90 m, water pipe approx. 105 m,
broadband empty pipes (trench length) approx. 100 m,
street lighting (trench length) approx. 100 m,
Gas pipeline laying approx. 230 m