Regular market at global price and flat rate. Global deadline of five months.
Study of the building for updating the heritage diagnosisThis batch includes the following studies:
— pollution studies,
— soil studies G1,
— structural studies,
— update of the heritage diagnosis following the studies of pollution, soils and structures to clarify the constraints of the architect of buildings in France.
The turnaround time is five months.
Modeling the flood riseThis batch includes a flood wave modelling study to verify the feasibility of the project while taking into account IRP regulation. The turnaround time is one month.
Diagnosis of Wood Biological Degradation AgentsThis lot includes a study of all the structures of buildings held on site, including all supporting and non-bearing elements associated with or separated from the buildings. The turnaround time is one month.