The subject of the Open House procedure is the execution of control tests and preliminary investigations in 11 service areas in accordance with the Additional Technical Contract Conditions and Guidelines
Soils, soil improvement and soil consolidation according to ZTV e-StBSubject of lot / performance range 1 are control tests soil, soil improvement and soil consolidation according to ZTV E-StB.
The details can be found in the service description and the specifications (Annexes 1 and 2 to the framework agreement). For the differentiated sub-service areas, reference is made to Section VIII of the admission form and to § 7 (2) framework agreement.
Road markingSubject of lot / performance range 10 are control tests road marking.
The details can be found in the service description and the specifications (Annexes 1 and 2 to the framework agreement)
Joints in traffic areas according to ZTV FuG-StBSubject of lot / performance range 11 are control tests joints in traffic areas according to ZTV Fug-StB.
The details can be found in the service description and the specifications (Annexes 1 and 2 to the framework agreement)
Layers without binder according to ZTV SoBStBSubject of lot / performance range 2 are control tests layers without binder according to ZTV SoB-StB.
The details can be found in the service description and the specifications (Annexes 1 and 2 to the framework agreement). For the differentiated sub-service areas, reference is made to Section VIII of the admission form and to § 7 (2) framework agreement.
base layers with hydraulic binders and concrete road surfaces according to ZTV Beton-StBSubject of lot / performance range 3 are control tests base layers with hydraulic binders and concrete road slabs according to ZTV Beton-StB.
The details can be found in the service description and the specifications (Annexes 1 and 2 to the framework agreement). For the differentiated sub-service areas, reference is made to Section VIII of the admission form and to § 7 (2) framework agreement.
Asphalt construction methods according to ZTV Asphalt-StBSubject of lot / performance range 4 are control tests asphalt construction methods according to ZTV Asphalt-StB.
The details can be found in the service description and the specifications (Annexes 1 and 2 to the framework agreement). For the differentiated sub-service areas, reference is made to Section VIII of the admission form and to § 7 (2) framework agreement.
Structural maintenance of traffic areas - asphalt construction methods according to ZTV BEA-StBSubject of lot / service area 5 are control tests Structural maintenance of traffic areas - asphalt construction methods according to ZTV BEA-StB.
The details can be found in the service description and the specifications (Annexes 1 and 2 to the framework agreement). For the differentiated sub-service areas, reference is made to Section VIII of the admission form and to § 7 (2) framework agreement.
Surface properties of the top layerSubject of the lot / performance range 6 are surface properties of the top layer.
The details can be found in the service description and the specifications (Annexes 1 and 2 to the framework agreement). For the differentiated sub-service areas, reference is made to Section VIII of the admission form and to § 7 (2) framework agreement.
Bitumen examinations according to TL BitumenStB and investigations on bitumen emulsions according to TL BE-StBSubject of lot / performance range 7 are control tests bitumen examinations according to TL bitumen-StB and investigations on bitumen emulsions according to TL BE-StB.
The details can be found in the service description and the specifications (Annexes 1 and 2 to the framework agreement). For the differentiated sub-service areas, reference is made to Section VIII of the admission form and to § 7 (2) framework agreement.
Testing of environmentally relevant parametersSubject of lot / performance range 8 are control tests Testing of environmentally relevant parameters.
The details can be found in the service description and the specifications (Annexes 1 and 2 to the framework agreement).
Structural engineeringSubject of lot / performance range 9 are control tests for structural engineering.
The details can be found in the service description and the specifications (Annexes 1 and 2 to the framework agreement)