Planning services for the construction of a cycle path along the S 272 south of Schwarzenberg in the Ore Mountains district. The project envisages the new cycle transport facility with nine bridge structures, three cantilever panels and three retaining walls.
The total distance of the new construction project is approximately 7.8 km.
Further explanations: see section II.2.4) of the contract notice.
A) Property planning engineering structures (OP IngBW): complete basic analysis (Lph 1) and complete preliminary planning (Lph 2) and optionally: complete design planning (Lph 3) and pro-rata preparation of the award (Lph 6); performance profile according to HOAI § 43 in connection with (IVm) HOAI facility (Anl) 12.1 and the technical terms of contract ( TVB) - Engineering structures in the current version as well as the service description in the tender documents (VU).
Technical planning of structural design (FP TWP): complete preliminary planning (Lph 2) and optionally: complete design planning (Lph 3) and complete preparation of the assignment (Lph 6); performance profile according to HOAI § 51 in conjunction with HOAI Anl 14.1 as well as the TVB structural engineering in the current version and the service description in the VU.
The service is to be provided in German.
B) The scope of optional engineering services, in addition to basic services (GL), also includes special services (BL), including safety and health protection coordination (SigEko) in accordance with the Construction Site Ordinance (BauStellV) for the planning phase of engineering structures. Further information according to the VU's specifications.
C) Performance period: expected from 10/2022