- Construction of 7 well shafts
- Laying of well pipes and cables
(Gesamttrassenlänge rd. 1.400 m)
- 7 x PE100 RC DA 90 to 125 pipelines
- 7 x power cables NYY-J 4 x 10mm2 to 4 x 35mm2
- 7 x fiber optic control cable (type 4x OS2; A-DQ(ZN)B2Y)
Preparation of the installation area for the
Grundwasseraufbereitungsanlage
- Area size: 50 x 31 m (1,550 m2)
- soil removal 0.4 m, leveling, compacting,
- Produce gravel surface, application thickness 0.5 m
Pure water drain line to the infiltration system
- Pipeline PP SN10 DN400 *15,3
- cable length approx. 700 m,
Construction of infiltration system
- 5 x 300 m seepage trench, with connecting pipes and
Zulaufschächten,
- Construction of the trenches as a seepage tunnel in the gravel bed
Power supply
- Laying a power cable from the transformer station south of the
Runway
- the installation area of the GWRA,
- Pipeline length approx. 500 m, of which 170 m is underpass
Runway and
- Taxiway by means of horizontal drilling
- Construction of 7 well shafts
- Laying of well pipes and cables
(Gesamttrassenlänge rd. 1.400 m)
- 7 x PE100 RC DA 90 to 125 pipelines
- 7 x power cables NYY-J 4 x 10mm2 to 4 x 35mm2
- 7 x fiber optic control cable (type 4x OS2; A-DQ(ZN)B2Y)
Preparation of the installation area for the
Grundwasseraufbereitungsanlage
- Area size: 50 x 31 m (1,550 m2)
- soil removal 0.4 m, leveling, compacting,
- Produce gravel surface, application thickness 0.5 m
Pure water drain line to the infiltration system
- Pipeline PP SN10 DN400 *15,3
- cable length approx. 700 m,
Construction of infiltration system
- 5 x 300 m seepage trench, with connecting pipes and
Zulaufschächten,
- Construction of the trenches as a seepage tunnel in the gravel bed
Power supply
- Laying a power cable from the transformer station south of the
Runway
- the installation area of the GWRA,
- Pipeline length approx. 500 m, of which 170 m is underpass
Runway and
- Taxiway by means of horizontal drilling
Within the scope of the project/the commissioned services, the following facilitation applies with regard to the security check:
The Ü2 security check must be applied for for all personnel deployed at the aerodrome and proof of its initiation must be provided to the client.
If the Ü2 security check is not completed and initiated, the employee(s) of the contractor will be granted access to the property (date of first access). The necessary security is provided by the Bundeswehr. The provisions of "Section 10.1 Persons from security-relevant countries" remain unaffected.