Engineering planning of hydraulic engineering measures in the form of expansion measures such as profile extensions and depressions, new construction, excavation and embankment development of ditches in flowing waters
- lot 1: technical planning,
- Lot 2: nature conservation planning.
The mill stream is a mining-influenced waters, which has been channeled at the open-pit land by underground piping and a fixed water bed. The waters should be cleared up and developed close to nature taking into account the geotechnical requirements, and passages for crossings should be taken into account.
Engineering services in accordance with the services provided by HOAI are to be provided for the water development project. It is necessary to develop a draft / approval plan for the water licensing procedure.
The following services have to be provided:
- engineering structures LP1-LP4 (optional LP5 to LP8),
- the technical planning of structural planning LP1-LP4 (optional LP5 to LP6),
- Geotechnical engineering including preparation of an exploration concept and monitoring.
The exploration services:
- geotechnical calculations (optional),
- Engineering survey (optional),
- hydraulic calculations (1-D modeling),
- static calculations mountain damage protection (optional),
- local construction supervision (optional).
The mill stream is a mining-influenced waters, which has been channeled at the open-pit land by underground piping and a fixed water bed. The waters should be uncovered
And developed close to nature taking into account the geotechnical requirements and passages for road crossings are taken into account.
Engineering services in accordance with the services provided by HOAI are to be provided for the water development project. It is necessary to develop a draft / approval plan for the water licensing procedure.
The following services must be provided:
- services of area planning (landscape care plan) LP1-LP4,
- Free layout planning services LP1-LP8 (optional LP5 to LP8).
Special services:
- adaptation of species protection contribution,
- Environmental supervision (optional).