Construction and installation works for the reconstruction and new construction of overhead and cable low-voltage networks with the relocation of electric meter panels to property boundaries in the territory of the city of Sofia, serviced by 'Electricity Distribution Networks West' JSC, ref. No. PPS 26-066 | Tenderlake

Construction and installation works for the reconstruction and new construction of overhead and cable low-voltage networks with the relocation of electric meter panels to property boundaries in the territory of the city of Sofia, serviced by 'Electricity Distribution Networks West' JSC, ref. No. PPS 26-066

Contract Value:
EUR 3M - 3M
Notice Type:
Contract Notice
Published Date:
03 July 2026
Closing Date:
03 August 2026
Location(s):
BG411 София (столица) (Sofia (stolitsa)) (BG Bulgaria/БЪЛГАРИЯ (BULGARIA))
Assessment:
This notice contains 1 positive AI Assessment(s) of your products/services' relevance for this procurements.  
Sign in to Tenderlake with your Pro or Primary account to read the assessments.
Description:
Construction and installation works are required for the reconstruction and new construction of overhead and cable low-voltage networks, including the relocation of electric meter panels in various districts of Sofia.

'Electricity Distribution Networks West' EAD is conducting a negotiation procedure with a preliminary invitation for participation related to: 'Construction and installation works for reconstruction and new construction of overhead and cable low voltage networks with relocation of meter boards to property boundaries in the territory of Sofia City, managed by 'Electricity Distribution Networks West' EAD, Ref. No. RRS 26-066.

The subject of the public procurement is divided into four separate positions as follows:
Position No. 1: 'Construction and installation works for reconstruction and new construction of overhead and cable low voltage networks with relocation of meter boards to property boundaries in the territory of Sofia City - West Center (OC West)'
Position No. 2: 'Construction and installation works for reconstruction and new construction of overhead and cable low voltage networks with relocation of meter boards to property boundaries in the territory of Sofia City - East Center (OC East)'
Position No. 3: 'Construction and installation works for reconstruction and new construction of overhead and cable low voltage networks with relocation of meter boards to property boundaries in the territory of Sofia City - South Center (OC South)'
Position No. 4: 'Construction and installation works for reconstruction and new construction of overhead and cable low voltage networks with relocation of meter boards to property boundaries in the territory of Sofia City - North Center (OC North)'

Each candidate/participant may participate for all separate positions (one or more separate positions) related to the subject of the order. The contracting authority does not limit the number of separate positions that can be awarded to the same contractor.
The criterion for awarding this public procurement during the determination of the most economically advantageous offer is the 'lowest price'. Participants are ranked separately for each individual position. The position is awarded to the participant offering the lowest total price for executing the order.

The contract term for each separate position is 24 months (twenty-four) or until the maximum contract value is reached, whichever occurs first.

The category of constructions falling within each of the four separate positions under this public procurement is third, in accordance with Article 137, paragraph 1, item 3, letters b) and j) from the Law on Spatial Planning. The group of constructions falling within the scope of each of the separate positions under this public procurement is third - constructions from the energy infrastructure, in accordance with Article 5, paragraph 1, item 3 of the Rules for Registration and Maintenance of the Central Professional Register of Builders (CPRB).

LOT-0001
Construction and installation works for reconstruction and new construction of overhead and cable low voltage networks with relocation of meter boards to property boundaries in the territory of Sofia City - West Center.
Construction and installation works for reconstruction and new construction of overhead and cable low voltage networks with relocation of meter boards to property boundaries in the territory of Sofia City - West Center.
Position No. 1 covers the territories of the following districts in the Sofia Municipality: Novi Iskar, Lyulin, Vazrazhdane, Vrubnitsa, Bankya, Ilinden, and Krasna Polyana.

Some of the main construction and installation works and quantities for the position, including but not limited to: Dismantling of reinforced concrete poles (125; 250; 360; 590; 835; NCG) with surface restoration around the pole and transportation to the warehouse of ELECTRICITY DISTRIBUTION NETWORKS WEST EAD (EDN WEST EAD) or depot - 45 pcs.; Dismantling of existing single-phase meter - 365 pcs.; Installation of steel pipe poles up to h=7.5m - 175 pcs.; Installation of reinforced concrete poles 250/9.5 - 65 pcs.; Grounding - 575 pcs.; Installation of meter boards on poles/walls with size type 0P or 1P with dispatcher numbering - 245 pcs.; Installation of meter boards on poles/walls with size type 2P or 3P with dispatcher numbering - 340 pcs.; Pulling internal cable 2x16 mm2 from the meter board to the subscriber - 780 pcs.; Installation of LV cable from 3x35+54.6 to 3x150+95 mm2 for inter-pole - 305 pcs.; Installation of single-phase switch (automatic or load) - 1050 pcs.; Installation of new single-phase meter - 450 pcs.; Installation of new three-phase meter - 170 pcs.; Excavation with backfill and tamping (including on existing cables) - 750 m3; Laying of PVC pipes up to Ø 160 mm in a concrete casing with supply and laying of concrete B-15 - 1800 m.; Laying of ALP cable up to 4x95 mm2 inclusive in excavation - 725 m. and other construction and installation works described in the bill of quantities for the respective position, attached to the Technical specifications and requirements of the Contracting Authority, correspondingly in the bill of quantities and unit rates attached to the bid documentation for the public procurement.

The category of constructions within the scope of the position under this public procurement is third, in accordance with Article 137, paragraph 1, item 3, letters b) and j) from the Law on Spatial Planning. The group of constructions within the scope of the position under this public procurement is third – constructions from the energy infrastructure, in accordance with Article 5, paragraph 1, item 3 of the Rules for Registration and Maintenance of the CPRB.

The execution of the contract for each position depends on the technical readiness of the Contracting Authority to assign the execution. For assigning specific types of works, the Contracting Authority prepares an execution assignment document containing at least the following information: types of works and their quantity, execution period, price based on unit prices, and other information necessary for executing the types of works. The execution assignment document is signed by the Contracting Authority and the Contractor in the manner and procedure described in the project contract. The acceptance of completed work for each execution assignment document is executed with an acceptance protocol signed by both parties to the contract, in the manner and procedure described in the project contract.

LOT-0002
Construction and installation works for reconstruction and new construction of overhead and cable low voltage networks with relocation of meter boards to property boundaries in the territory of Sofia City - East Center.
Construction and installation works for reconstruction and new construction of overhead and cable low voltage networks with relocation of meter boards to property boundaries in the territory of Sofia City - East Center.
​​​​​ Position No. 2 covers the territories of the following districts in the Sofia Municipality: Mladost, Iskar, Pancharevo, Izgrev, Sredets, Samokov (Yarema resort and the area of Stenata) and Student Town.

Some of the main construction and installation works and quantities for the position, including but not limited to: Dismantling of reinforced concrete poles (125; 250; 360; 590; 835; NCG) with surface restoration around the pole and transportation to the warehouse of ELECTRICITY DISTRIBUTION NETWORKS WEST EAD (EDN WEST EAD) or depot - 40 pcs.; Dismantling of existing single-phase meter - 315 pcs.; Installation of steel pipe poles up to h=7.5m - 150 pcs.; Installation of reinforced concrete poles 250/9.5 - 55 pcs.; Grounding - 500 pcs.; Installation of meter boards on poles/walls with size type 0P or 1P with dispatcher numbering - 200 pcs.; Installation of meter boards on poles/walls with size type 2P or 3P with dispatcher numbering - 290 pcs.; Pulling internal cable 2x16 mm2 from the meter board to the subscriber - 680 pcs.; Installation of LV cable from 3x35+54.6 to 3x150+95 mm2 for inter-pole - 265 pcs.; Installation of single-phase switch (automatic or load) - 950 pcs.; Installation of new single-phase meter - 400 pcs.; Installation of new three-phase meter - 160 pcs.; Excavation with backfill and tamping (including on existing cables) - 690 m3; Laying of PVC pipes up to Ø 160 mm in a concrete casing with supply and laying of concrete B-15 - 1600 m.; Laying of ALP cable up to 4x95 mm2 inclusive in excavation - 690 m. and other construction and installation works described in the bill of quantities for the respective position, attached to the Technical specifications and requirements of the Contracting Authority, correspondingly in the bill of quantities and unit rates attached to the bid documentation for the public procurement.

The category of constructions within the scope of the position under this public procurement is third, in accordance with Article 137, paragraph 1, item 3, letters b) and j) from the Law on Spatial Planning. The group of constructions within the scope of the position under this public procurement is third – constructions from the energy infrastructure, in accordance with Article 5, paragraph 1, item 3 of the Rules for Registration and Maintenance of the CPRB.

The execution of the contract for each position depends on the technical readiness of the Contracting Authority to assign the execution. For assigning specific types of works, the Contracting Authority prepares an execution assignment document containing at least the following information: types of works and their quantity, execution period, price based on unit prices, and other information necessary for executing the types of works. The execution assignment document is signed by the Contracting Authority and the Contractor in the manner and procedure described in the project contract. The acceptance of completed work for each execution assignment document is executed with an acceptance protocol signed by both parties to the contract, in the manner and procedure described in the project contract.

LOT-0003
Construction and installation works for reconstruction and new construction of overhead and cable low voltage networks with relocation of meter boards to property boundaries in the territory of Sofia City - South Center.
Construction and installation works for reconstruction and new construction of overhead and cable low voltage networks with relocation of meter boards to property boundaries in the territory of Sofia City - South Center.
Position No. 3 covers the territories of the following districts in the Sofia Municipality: Lozenets, Krasno Selo, Triaditsa, Ovcha Kupel, and Vitosha.

Some of the main construction and installation works and quantities for the position, including but not limited to: Dismantling of reinforced concrete poles (125; 250; 360; 590; 835; NCG) with surface restoration around the pole and transportation to the warehouse of ELECTRICITY DISTRIBUTION NETWORKS WEST EAD (EDN WEST EAD) or depot - 35 pcs.; Dismantling of existing single-phase meter - 270 pcs.; Installation of steel pipe poles up to h=7.5m - 130 pcs.; Installation of reinforced concrete poles 250/9.5 - 50 pcs.; Grounding - 435 pcs.; Installation of meter boards on poles/walls with size type 0P or 1P with dispatcher numbering - 180 pcs.; Installation of meter boards on poles/walls with size type 2P or 3P with dispatcher numbering - 255 pcs.; Pulling internal cable 2x16 mm2 from the meter board to the subscriber - 595 pcs.; Installation of LV cable from 3x35+54.6 to 3x150+95 mm2 for inter-pole - 230 pcs.; Installation of single-phase switch (automatic or load) - 765 pcs.; Installation of new single-phase meter - 365 pcs.; Installation of new three-phase meter - 145 pcs.; Excavation with backfill and tamping (including on existing cables) - 535 m3; Laying of PVC pipes up to Ø 160 mm in a concrete casing with supply and laying of concrete B-15 - 1285 m.; Laying of ALP cable up to 4x95 mm2 inclusive in excavation - 590 m. and other construction and installation works described in the bill of quantities for the respective position, attached to the Technical specifications and requirements of the Contracting Authority, correspondingly in the bill of quantities and unit rates attached to the bid documentation for the public procurement.

The category of constructions within the scope of the position under this public procurement is third, in accordance with Article 137, paragraph 1, item 3, letters b) and j) from the Law on Spatial Planning. The group of constructions within the scope of the position under this public procurement is third – constructions from the energy infrastructure, in accordance with Article 5, paragraph 1, item 3 of the Rules for Registration and Maintenance of the CPRB.

The execution of the contract for each position depends on the technical readiness of the Contracting Authority to assign the execution. For assigning specific types of works, the Contracting Authority prepares an execution assignment document containing at least the following information: types of works and their quantity, execution period, price based on unit prices, and other information necessary for executing the types of works. The execution assignment document is signed by the Contracting Authority and the Contractor in the manner and procedure described in the project contract. The acceptance of completed work for each execution assignment document is executed with an acceptance protocol signed by both parties to the contract, in the manner and procedure described in the project contract.

LOT-0004
Construction and installation works for reconstruction and new construction of overhead and cable low voltage networks with relocation of meter boards to property boundaries in the territory of Sofia City - North Center.

Construction and installation works for the reconstruction and new construction of overhead and cable low voltage networks with installation of electric meter panels at property boundaries in the territory of the city of Sofia - OC North.

Designated position No. 4 covers the territory and will be executed in the following districts of the Sofia Municipality: Serdika, Poduyane, Slatina, Kremikovtsi, Oborishte, and Nadezhda.

Some of the main types of construction and installation works and quantities for the designated position, including but not limited to, are: Dismantling of reinforced concrete poles (125; 250; 360; 590; 835; NCG) with pavement restoration around the pole and transportation of dismantled pole to the warehouse of ELECTRICITY DISTRIBUTION NETWORKS WEST EAD (EDN WEST EAD) or to the depot - 4 pcs.; Dismantling of existing single-phase electric meter – 180 pcs.; Installation of steel tube pole up to h=7.5m. – 90 pcs.; Installation of reinforced concrete pole 250/9.5 – 35 pcs.; Creating grounding – 290 pcs.; Installation of electric meter panel on pole/wall size 0P or 1P with dispatcher numbering – 120 pcs.; Installation of electric meter panel on pole/wall size 2P or 3P with dispatcher numbering – 165 pcs.; Pulling VKL 2x16 mm2 from the electric panel to the subscriber – 385 pcs.; Installation of LV VKL from 3x35+54.6 to 3x150+95 mm2 for inter-pole span – 160 pcs.; Installation of single-phase breaker (automatic or load) – 550 pcs.; Installation of new single-phase electric meter – 240 pcs.; Installation of new three-phase electric meter – 95 pcs.; Excavation with backfilling and compaction (including over existing cables) – 350 m³; Laying PVC pipes up to Ø 160 mm in concrete casing with delivery and laying of concrete B-15 – 910 m.; Laying cable SAVT up to 4x95 mm2 including in the trench – 350 m. and other types of construction and installation works, which are detailed in the quantity account for the respective designated position, attached to the Technical Specifications and Requirements of the Contracting Authority, respectively in the quantity-value account for the respective designated position, attached to the price offer from the public procurement documentation.

The category of constructions within the scope of the designated position of the present public procurement is third, pursuant to art. 137, para. 1, item 3, letters b) and g) of the Spatial Development Act. The group of constructions within the scope of the designated position of the present public procurement is third – constructions from the energy infrastructure, pursuant to art. 5, para. 1, item 3 of the Regulation on the procedure for registration and maintenance of the Central Professional Register of Builders (CPRBR).

The execution of the contract for each designated position will be carried out depending on the technical readiness of the Contracting Authority for assigning the execution. For the assignment of specific works, the Contracting Authority draws up a document for assigning the execution, containing at least the following information: types of works and their quantity, execution period, price based on unit prices and other information necessary for the execution of the types of works. The document for assigning the execution is signed by the Contracting Authority and the Contractor, in the order and manner described in the draft contract. The acceptance of the completed work on each document for assigning the execution is carried out with an acceptance certificate, signed by both parties to the contract, in the order and manner described in the draft contract.

The Buyer:
Електроразпределителни мрежи Запад ЕАД
Additional information:
Link:
Additional document: 591468
Link:
View Full Notice
Link:
Additional document: 591350
Link:
Additional document: 591474
Link:
Additional document: 591246
Link:
Download Full Notice as PDF
CPV Code(s):
45231400 - Construction work for electricity power lines