Maintenance of flat roofs
The consultation is divided into 2 lots. Each lot consists of one firm slice and two optional slices.
Entrtetien of roof terracesLot 1: Rental buildings attached to the Territorial Directorate of Coronaries
o Firm tranche: Roofs made after 2014
o Optional tranche 1: Roofs made before 2000
o Optional tranche 2: Roofs built between 2000 and 2013 included
Maintenance of flat roofsLot 2: Rental buildings attached to the Territorial Directorate of the Three Cities, buildings rented entirely to a third party and administrative buildings
o Firm tranche: Roofs made after 2014
o Optional tranche 1: Roofs made before 2000
o Optional tranche 2: Roofs built between 2000 and 2013 included