New construction of the municipal indoor swimming pool in Nördlingen:
Bruttogrundfläche: 6.000 m²
Gross floor area: 3,700 m²
Bruttorauminhalt: 35.000 m²
Dimensions:
Indoor swimming pool: 75 m x 26 m
Changing rooms: 65 m x 11.30 m
Sauna: 52 m x 16.25 m
Außensauna: 18 m x 7 m
Construction of heating systems
-1 central pressure retention
-20 circulating pumps
-1,200 m² underfloor heating
-15 connections to air conditioning / heat exchanger
-Approx. 1,250 m welded steel pipe