The expansion and energetic renovation of the community center in Hausen with small sports hall is planned in 2 construction phases. The first phase of construction includes the extension of the town hall, the renovation of the existing town hall, the restaurant and the rooms of the local sports club.
For this purpose, the building will be completely gutted. The service includes drywall work DIN 18340.
A24-2022 Drywall work 1st BA
600 m2 mounting wall 150 mm, 2x12.5 mm GKB,
110 m2 Montagewand 150 mm, F30, 2x12,5 mm, GKB, Rw,R 37 dB
200 m2 mounting wall, 125 mm, F30, 2x12.5 mm GKB,
60 m2 Installationswand, d = 250 mm, h = ca. 313.5 cm
590 m2 suspended ceiling with metal UK, 1x12.5 mm, Q3
27 m2 MF-Rasterdecke
465 m2 fire protection and exposed ceiling as a combined ceiling system for trapezoidal sheet metal roofs
35 m2 fire protection and MF grid ceiling as a combined ceiling system for trapezoidal sheet metal roof