Water-treatment plant construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
28 August 2019
Closing Date:
23 September 2019
Location(s):
DE40G Spree-Neiße (DE Germany/DEUTSCHLAND)
Description:
Industriepark Schwarze Pumpe, construction of a service and process water purification and distribution system; Lot 1 - works; Lot 2 - technical equipment; Lot 3 - EMSR

ASG Spremberg GmbH is planning to set up a service and process water purification and distribution system (BPRVA) at the industrial site Schwarze Pumpe (ISP) to ensure that the ISP is supplied with service water.

The lot 1 to be processed includes all the works which comprise the soil improvement measures, the pipeline construction and the construction of the structures. The services of plant engineering are formulated as follows:

Molchbauwerk, measuring shaft pump reservoir, filter hall buffer tank for backwash water, water heater, pumping station, inlet and outlet (DN 500) to the BPRVA including the backwash water line and sludge line.

Lot 2 to be processed includes all equipment related to the provision and installation of piping, fittings, pumps and measuring instruments within the structures. The performance of the equipment is formulated as follows:

- shaft equipment of the structures pig building, measuring shaft, buffer tank for backwash water,

- Equipment for the pump storage tank including pipe grid cascades,

- defrosting and demanganizing filters, pumps and fittings for the filtration hall,

- equipment for the water heater,

- Pumps and equipment for the pumping station after service water tank.

The lot 3 to be processed includes all EMSR services, which include cable laying, the connection of electrical installations and the connection to the central process control system as well as programming. The services of EMSR are formulated as follows for all plant components:

- connection and commissioning of measuring equipment,

- laying and connection of the wiring,

- connection switchgear,

- Connection of emergency power system,

- Programming for connection to the central process control system.


construction services

The lot 1 to be processed includes all the works which comprise the soil improvement measures, the pipeline construction and the construction of the structures. The services of plant engineering are formulated as follows:

- Reinforced concrete pig structure of compressive strength class C35 45 with concrete abutments; Outside dimensions including concrete abutment 6.10 x 3.40 x 3.35 m; Excavation pit with the dimensions 8,10 x 5,40 x 3,80 m,

- Test chamber made of reinforced concrete of compressive strength class C35 45 with concrete abutments; Outside dimensions incl. Concrete abutment 8,50 x 5,80 x 3,60 m; Excavation pit measuring 9.00 x 6.40 x 4.10 m,

- Pump tank made of reinforced concrete of compressive strength class C35 45 with surface for pipe mesh cascades; External dimensions 20.10 x 7.60 x 4.85 m; Excavation pit measuring 22.10 x 9.6 x 5.5 m,

- Filter hall as a thermally insulated solid system hall with insulating panel (core thickness of 150 mm); Dimensions 45.00 x 29.00 x 9.70 m,

- buffer tank for backwash water made of reinforced concrete of compressive strength class C35 45; External dimensions 12,50 x 5,00 x 3,10 m; Excavation pit with the dimensions 14,50 x 7,60 x 3,60 m,

- Domestic hot water storage tank with approx. 5,000 m 3 as a round container with chamber separation made of reinforced concrete of compressive strength class C35 / 45; Diameter 30.70 m, height 8.00 m; Excavation pit with a diameter of 33.50 m and a depth of 4.80 m,

- Pumping station to service water tank as a warehouse in system construction; Dimensions 11,50 x 6,80 x 5,00 m,

- Inlet and outlet (DN 500) to the BPRVA including the backwash water line and sludge line to the ABA II (d140 x 8.3).


Technical equipment

Lot 2 to be processed includes all equipment related to the provision and installation of piping, fittings, pumps and measuring instruments within the structures. The performance of the equipment is formulated as follows:

- shaft equipment of the structures pig building, measuring shaft, buffer tank for backwash water,

- Equipment for the pump storage tank including pipe grid cascades,

- defrosting and demanganizing filters, pumps and fittings for the filtration hall,

- equipment for the water heater,

- Pumps and equipment for the pumping station after service water tank.


EMSR

The lot 3 to be processed includes all E / MSR services, which include the laying of cables, the connection of electrical installations and the connection to the central process control system as well as the programming. The services provided by E / MSR are formulated as follows for all plant components:

- connection and commissioning of measuring equipment,

- laying and connection of the wiring,

- connection switchgear,

- Connection of emergency power system,

- Programming for connection to the central process control system.

Download full details as .pdf
The Buyer:
Zweckverband Industriepark Schwarze Pumpe (ZV ISP) vertreten durch die ASG Spremberg GmbH als Treuhänder
CPV Code(s):
42912300 - Machinery and apparatus for filtering or purifying water
42912350 - Filtration plant equipment
44162500 - Drinking-water piping
45232152 - Pumping station construction work
45232154 - Construction work of elevated tanks for drinking water
45252120 - Water-treatment plant construction work
45252210 - Water purification plant construction work
45311000 - Electrical wiring and fitting work
45317100 - Electrical installation work of pumping equipment
45317400 - Electrical installation work of filtration equipment