1. The subject of the bill of quantities is the complete monitoring of the inner-city tunnels and the control of the technical systems in accordance with the requirements of RABT 2006 as well as EABT, the Ernst-Reuter-Allee/Hauptbahnhof tunnel, the Universitätsplatz and the Askanischer Platz tunnel in Magdeburg. Site plans are attached as an appendix.
Brief description of the tunnels:
Ernst-Reuter-Allee: 340 m long directional traffic tunnel, 155 m long trough areas each, one tunnel tube in each direction of travel, southern tube with connection to the City Carré underground car park
Universitätsplatz: 181 m long two-way traffic tunnel, western trough 110 m, eastern trough 59 m, one tunnel tube
Askanischer Platz: 226.5 m long two-way traffic tunnel, northern trough 105.5 m, southern trough 120 m, one tunnel tube
1. The subject of the bill of quantities is the complete monitoring of the inner-city tunnels and the control of the technical systems in accordance with the requirements of RABT 2006 as well as EABT, the Ernst-Reuter-Allee/Hauptbahnhof tunnel, the Universitätsplatz and the Askanischer Platz tunnel in Magdeburg. Site plans are attached as an appendix.
Brief description of the tunnels:
Ernst-Reuter-Allee: 340 m long directional traffic tunnel, 155 m long trough areas each, one tunnel tube in each direction of travel, southern tube with connection to the City Carré underground car park
Universitätsplatz: 181 m long two-way traffic tunnel, western trough 110 m, eastern trough 59 m, one tunnel tube
Askanischer Platz: 226.5 m long two-way traffic tunnel, northern trough 105.5 m, southern trough 120 m, one tunnel tube