I) Phase I: supply and installation of control cabinets for all the infrastructures constituting the ski lift located along the Annette and Lubin hill at SPA (see location plan in Appendix III);
II) Phase II: in-depth maintenance as described in points 4 to 10 of the technical clauses
III) Phase III:
a) the inspection and preventive maintenance of all the infrastructures allowing the normal operation of the two cabins constituting said mechanical lift;
b) repair of these infrastructures in the event of untimely breakdown and malfunction.
I) Phase I: supply and installation of control cabinets for all the infrastructures constituting the ski lift located along the Annette and Lubin hill at SPA (see location plan in Appendix III);
II) Phase II: in-depth maintenance as described in points 4 to 10 of the technical clauses;
III) Phase III:
a) the inspection and preventive maintenance of all the infrastructures allowing the normal operation of the two cabins constituting said mechanical lift;
b) repair of these infrastructures in the event of untimely breakdown and malfunction.