New replacement primary school with gym in Grünhainichen — ventilation installations
Ventilation installation work as part of the measure replacement new primary school with hoorway and sports hall in Grünhainichen.
The object of the performance is the installation of 3 internally arranged ventilation systems with heat recovery for mechanical ventilation of internal rooms and the kitchen.
The HVAC unit 1 has an air flow rate of 2,900 m3/hand is hung as a ceiling-hanging device in the hallway of the school building, it ventilates and ventilates the school's internal rooms. The HVAC unit 2 has an air flow rate of 2 400 m3/hand is hung in the kitchen as a ceiling hanging device. This device is used to ventilate and deflate the kitchen. The RLT unit 3 has an air volume of 2 900 m 3/h and is installed in the fan control unit. This device supplies the internal shower and dressing rooms of the sports hall.