New construction of the municipal indoor swimming pool in Nördlingen:
Bruttogrundfläche: 6.000 m²
Gross floor area: 3,700 m²
Bruttorauminhalt: 35.000 m²
Dimensions:
Indoor swimming pool: 75 m x 26 m
Changing rooms: 65 m x 11.30 m
Sauna: 52 m x 16.25 m
Außensauna: 18 m x 7 m
Metal construction work façade:
-approx. 850 m² mullion-transom façades, consisting of load-bearing steel construction with a mullion-transom top construction, 3-fold glazing with thermal or
Solar control glass, some in the form of bird protection glass, some with panel fillings in light metal or enamelled glass.
-14 pieces of door insert elements or frame doors made of highly thermally insulated steel profile systems, some with automatic door drive systems, access control systems and
Escape door protection systems
-3 pieces of insulated steel doors approved for outdoor use
-approx. 5 running metres of window sills with tightly welded edge connections
-approx. 10 sun protection systems as a basis awnings with electric drives
-Various components for access control and escape route security.