Grinding work with track-bound vehicles in the VBK network.
Grinding work on tracks in the route network and in the light rail tunnel of Verkehrsbetriebe Karlsruhe GmbH (VBK):
Grinding work with two-way vehicles or track-bound vehicles:
Grinding new rails and removing the rolled skin with 03 mm removal on grooved and Vignol rails such. B. 67R1, 60R2, 59R2 and 49E1 approx. 3,000.00 m
Ripple removal by grinding the entire head width Deburring and reprofiling on grooved and Vignol rails such as B. 67R1, 60R2, 59R2 and 49E1.
The:
- Actual and target profiling up to 1 mm on the driving edge. approx. 17,500.00 m;
- Actual and target profiling up to 2 mm at the driving edge. approx. 11,500.00 m;
- Actual and target profiling up to 3 mm at the driving edge. approx. 7 500.00 m;
- Actual and target profiling over 3 mm at the driving edge. approx. 3 500.00 m;
- mechanical grinding of striking damaged areas. approx. 500.00 pc.