Structural design according to HOAI 2021 § 51 Part 4, Section 1, Service Phase 1-6
Project:
Planning of a 3-fold sports hall with outdoor sports facilities in the northern part of Nuremberg
Project scope:
On behalf of the City of Nuremberg, WBG KOMMUNAL GmbH is supervising a new construction of a 3-fold sports hall, with grandstand and associated operating, storage and technical rooms in the northern part of Nuremberg.
The measures also include the construction of a natural grass pitch approx. 90x60m and an artificial turf pitch approx. 90x60m, as well as the construction of a jumping pit with inrun lanes. The measures were to be carried out in 3 construction phases.
Schedule:
Design planning 1.Q.2024
BA 1_Herstellung Kunstrasensportplatz 1.Q.2025 - 3.Q.2025
BA 2_Herstellung Naturrasensportplatz 3.Q.2025 - 1.Q.2026
BA 3_Errichtung Sports Hall 4.Q.2025 - 4.Q.2027
Budget:
For the above-mentioned measure, the client has estimated costs of approx. EUR 12.4 million "net" KG 200-700 and approx. EUR 9.3 million net KG 300-400. Assuming a 70% to 30% distribution between KG 300 and 400, this results in costs of approx. €2.6 million.
Scope:
The tendered services of structural engineering for buildings in accordance with §51 HOAI are commissioned in stages.
At least the achievements of level 1 will be awarded. In the case of commissioning, the commissioning of further service phases is carried out in whole or in part, in the following stages:
Stage 1: HOAI performance phase 1 - 2
Stage 2: HOAI performance phase 3 - 4
Stage 3: HOAI performance phase 5 - 7
Stage 4: HOAI performance phase 8 - 9
The contractor is not entitled to the commissioning of further services or levels 2 to 4 [in whole or in part]. No additional fee or compensation claims can be asserted from the phased commissioning.