The order includes the reinforcement and repair of the Achenbach viaduct near Siegen (B62)
Verstärkungsarbeiten:
Approx. 85 t prestressing steel (tendons) install
Install approx. 0.9 t of prestressing steel (stabanker)
approx. 31 m3 of reinforced concrete production
Install approx. 7 t reinforcing steel
produce approx. 700 composite anchors (B500 B, DN 10mm -12mm)
Approx. 260 holes up to DN 30mm
approx. 130 pcs. core bores up to DN 200mm
produce approx. 78 steel deflection structures
Repairs:
approx. 90 m² concrete repair on the superstructure
approx. 60 m² concrete repair on the cap
Repair approx. 37 m of road crossing construction
ca. 8200 m² Asphaltdeckschicht abfräsen
approx. 8200 m² asphalt surface course
approx. 50 m renew steel railing elements
replace approx. 85 m protective device
approx. 100 m3 earthworks
approx. 560 m electrical installations