In the course of the restructuring of the town centre, the city of Freiberg am Neckar intends to build the new
Oscar-Paret-Schule (OPS 1st construction phase already completed. ) and a three-field sports hall with adjoining
Sports areas (2.
stage of construction).
By lowering the sports hall by one storey, the level access to the foyer and
of the grandstand system from the urban space as well as a continuous equipment room. In addition, the
Sports hall in the urban space as a transparent sports and event hall.
The spacious foyer of the sports hall is accessed from the market square, a separate athletes' entrance is the
School square facing the school. Via an additional staircase, the gymnastics room and the outdoor sports areas are accessible from the
Changing rooms in the basement available.
VE 392-200 Painting work
1.150 m² interior painting ceilings
1.400 m² interior painting walls
3.600 m² Innenanstrich Satteldachbinder
60 m² floor coating