Road construction
Earthwork
Loosen and recycle soil approx. 1,700 m3
Loosen and recycle soil for soil replacement approx. 1,800 m3
Layers without binders
Produce frost protection layer approx. 660 m3
Produce ballast base course approx. 2400 m3
asphalt construction
Production of asphalt base course for various construction classes approx. 2,200 m2
Production of asphalt binder course for different construction classes approx. 1,365 m2
Production of asphalt surface course for different construction classes approx. 2,900 m2
Preparation of mastic asphalt surface course for different construction classes approx. 130 m2
Making connection joints in asphalt layers approx. 650 m
Paving surfaces and edgings
Laying concrete block paving slab approx. 1,240 m2
High and low curbs as a border approx. 750 m
Gully stones set approx. 460 m
Fabricating a technical structure
produce unreinforced concrete approx. 35 m3
Manufacture angle retaining wall (H 1.80 m) from StB prefabricated elements approx. 35 m
Facing masonry (sandstone) approx. 50 m2
Sandstone cover (W 45-50 cm) approx. 30 m
Manufacture steel railings approx. 30 m
Technical processing