The subject of the contract is the implementation of the task called "Extension of the national road No. 65 on the section Kowale Oleckie – the beginning of the Olecka bypass from km 21+210 to km 35+031.37"
The subject of the contract is the implementation of the task called "Extension of the national road No. 65 on the section Kowale Oleckie – the beginning of the Olecka bypass from km 21+210 to km 35+031.37".
This task includes:
- execution of a new roadway construction with a permissible load of 115 kN / axle with a width of 8.0 m,
- correction of vertical and horizontal arcs
- construction/reconstruction of culverts
- reconstruction of the bridge structure into a culvert
- extension of intersections
- construction of bus bays
- construction of road lighting
- felling/planting of trees, shrubs
- execution of road drainage
- construction of a technological channel
- construction / reconstruction of exits
- execution of BRD elements
- demolition of buildings in homestead buildings
- construction of vehicle inspection and brewing stations for the Road Transport Inspectorate together with the pre-selection system
- reconstruction of the existing technical infrastructure interfering with the designed road
Total estimated order of magnitude of the contract value: above 20,000,000 euros.