The subject of the contract is the supply of electricity to the Wrocław Stadium in Wrocław at Al. Śląska 1, in the amount of approximately 3,600 MWh, for a period of 12 months (01.01.2024 – 31.12.2024), with the ordered capacity:
- PPE power supply NR 590322415104135385 (SI connection, 20kV) - 1 000 kW
- PPE power supply NR 590322415104090096 (SII connectors, 20kV) — 900 kW
Connection group: III.
Tariff group: B23.
Measurement and billing system installed at 20kV voltage in R-3808.
The Ordering Party informs that in the Stadium (Tarczyński Arena) a photovoltaic installation with an installed capacity of 601.4 kWp (2 x 300.7kWp) and an estimated annual electricity production of about 550MWh is connected to the power grid.
1. The subject of the contract is the supply of electricity to the facility of the Wrocław Stadium in Wrocław at Al. Śląska 1, in the amount of approximately 3,600 MWh, for a period of 12 months (01.01.2024 – 31.12.2024), with the ordered capacity:
- PPE power supply NR 590322415104135385 (SI connection, 20kV) - 1 000 kW
- PPE power supply NR 590322415104090096 (SII connectors, 20kV) — 900 kW
Connection group: III.
Tariff group: B23.
Measurement and billing system installed at 20kV voltage in R-3808.
The Ordering Party informs that in the Stadium (Tarczyński Arena) a photovoltaic installation with an installed capacity of 601.4 kWp (2 x 300.7kWp) and an estimated annual electricity production of about 550MWh is connected to the power grid.
The buy-back of electricity will concern two PPEs in tariff group B23 listed in the PPE list. The Ordering Party plans to introduce approximately 15% of the electricity produced, i.e. approximately 80 MWh, into the Power Grid of Tauron Dystrybucja S.A. during the term of the agreement. The remaining (estimated) part of the generated electricity, i.e. approximately 470 MWh, will be used by the Ordering Party. The power of the sources assigned to each PPE separately is 300.7 kWp.
The selected Contractor will be obliged to act as an entity responsible for commercial balancing of PV installations and repurchase of electricity introduced into the DSO network on the terms presented by the Contractor in a separate agreement.
2. The estimated quantity of energy procured given in point 1 above is indicative in comparison of tenders and does not constitute on the part of the Contracting Authority an obligation to purchase energy in the quantity given. The Contractor shall not be entitled to any claim for the Contracting Authority's failure to collect the projected amount of energy.
3. Any change in the estimated estimated consumption will not result in additional costs for the Ordering Party, other than the settlement for the amount of energy actually consumed according to the prices specified in the tender documentation.