New construction of the vocational school centre in Constance - ventilation building ZG
Ventilation service description includes the following services:
- 3 central ventilation systems with heat recovery, total air volume 81,000 m³/h.
- Ventilation duct network made of verz. Sheet steel, consisting of approx. 6,100 m² with mineral wool insulation
- Ventilation pipe network made of verz. Sheet steel, consisting of approx. 800 m² with mineral wool insulation
- Kitchen ventilation ceiling approx. 69 m² exhaust air for laboratory systems 2300 m³/h, air duct network made of PP's approx. 160 m