Joinery work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
21 December 2021
Closing Date:
24 January 2022
Location(s):
DE716 Darmstadt-Dieburg (DE Germany/DEUTSCHLAND)
Description:
Fixed built-in cabinets-carpenter

Lot 1:

13 counters, some with glazing, for care bases or registrations

Lot 2:

140 pcs. patient room cabinets

17 desk elements for patient rooms, with built-in appliances

approx. 700 m of wood-based window sills

approx. 295 m wooden wall handrail

Approx. 35 m wooden wall handrail with integrated lighting

Lot 3:

57 pcs. Furnishing various work, living and storage rooms with built-in furniture, with built-in appliances

Lot 4:

3 pcs. Furnishing various work and storage rooms with built-in furniture

1 wardrobe element

8 dividing walls in lock rooms

1 sliding door system for chair storage

1 reception desk

approx. 70 m built-in wardrobes Hallway niches

approx. 24 m wall shelves

approx. 62 m² wall cladding wood panels

3 pcs. wooden door elements

A written request for the documents is to be avoided.

These are only available digitally and free of charge via www.subreport.de/e84312128! ATTENTION! We recommend that you download the tender documents only after registration. If the tender documents are downloaded without registration, there is no automatic information about changes or bidding requests. Obtaining information about changes is then the sole responsibility of the respective bidder!

Offers or requests to participate are to be submitted electronically via the function "Request for participation / submit offer" via: www.subreport.de

All further information is available at: http://www.ladadi.de/ausschaltungen

Built-in furniture care bases

Lot 1:

13 counters, some with glazing, for care bases or registrations

Single deadlines:

Start of preliminary planning: probably on 09.05.2022

Preparation of preliminary planning: expected on 09.05.2022 within 5 working days until probably 13.05.2022

Preparation of work schedule: expected on 16.05.2022 within 32 working days until probably 24.06.2022

Release of work planning (by Architket): expected on 27.06.2022 within 11 working days until probably 08.07.2022

Production of built-in furniture: expected on 11.07.2022 within 36 working days until probably 19.08.2022

Installation of built-in furniture level -1 to level 3: expected on 22.08.2022 within 52 working days until probably 21.10.2022

Complete completion of built-in furniture: within 145 working days after the start of planning mentioned above, probably until 21.10.2022

VOB: Security for the fulfillment of the contract is in the amount of 5%. H. the order amount (including sales tax, excluding supplements), provided that the order amount is at least 250,000 euros excluding sales tax.

VOB: The security to be provided for claims for defects is 3% of the settlement sum (including sales tax) including any supplements issued. Time of return for unutilized security for claims for defects (Section 17 (8) no. 2 VOB/B): ./. years

VOB: Contractual penalties (§ 11 VOB / B)

If the specified individual deadlines or the deadline for completion are exceeded, the contractor must pay as a contractual penalty for each working day of the delay: 0.1%. H. the order amount stated in the order letter excluding sales tax; Amounts for offered maintenance services are not taken into account. The reference value for calculating the contractual penalty if individual deadlines agreed as contractual deadlines are exceeded is that part of this order amount that corresponds to the services to be contractually provided up to this point in time. The contractual penalty is increased to a total of 5 percent. H. of the order amount stated in the order letter (excluding sales tax).

Forfeited contractual penalties for the delay due to non-compliance with individual deadlines agreed as a contractual deadline will be counted towards a contractual penalty for the delay due to non-compliance with the deadline for completion of the service.

Approx. 35 m wooden wall handrail with integrated lighting

Built-in patient room furniture

Lot 2:

140 pcs. patient room cabinets

17 desk elements for patient rooms, with built-in appliances

approx. 700 m of wood-based window sills

approx. 295 m wooden wall handrail

Single deadlines:

Start of preliminary planning: probably on 09.05.2022

Preparation of preliminary planning: expected on 09.05.2022 within 5 working days until probably 13.05.2022

Preparation of work schedule: expected on 16.05.2022 within 32 working days until probably 24.06.2022

Release of work planning (by Architket): expected on 27.06.2022 within 11 working days until probably 08.07.2022

Production of built-in furniture: expected on 11.07.2022 within 36 working days until probably 19.08.2022

Installation of built-in furniture level -1 to level 3: expected on 22.08.2022 within 52 working days until probably 21.10.2022

Complete completion of built-in furniture: within 145 working days after the start of planning mentioned above, probably until 21.10.2022

VOB: Security for the fulfillment of the contract is in the amount of 5%. H. the order amount (including sales tax, excluding supplements), provided that the order amount is at least 250,000 euros excluding sales tax.

VOB: The security to be provided for claims for defects is 3% of the settlement sum (including sales tax) including any supplements issued. Time of return for unutilized security for claims for defects (Section 17 (8) no. 2 VOB/B): ./. years

VOB: Contractual penalties (§ 11 VOB / B)

If the specified individual deadlines or the deadline for completion are exceeded, the contractor must pay as a contractual penalty for each working day of the delay: 0.1%. H. the order amount stated in the order letter excluding sales tax; Amounts for offered maintenance services are not taken into account. The reference value for calculating the contractual penalty if individual deadlines agreed as contractual deadlines are exceeded is that part of this order amount that corresponds to the services to be contractually provided up to this point in time. The contractual penalty is increased to a total of 5 percent. H. of the order amount stated in the order letter (excluding sales tax).

Forfeited contractual penalties for the delay due to non-compliance with individual deadlines agreed as a contractual deadline will be counted towards a contractual penalty for the delay due to non-compliance with the deadline for completion of the service.

Approx. 35 m wooden wall handrail with integrated lighting

Built-in furniture workspaces

Lot 3:

57 pcs. Furnishing various work, living and storage rooms with built-in furniture, with built-in appliances

Single deadlines:

Start of preliminary planning: probably on 09.05.2022

Preparation of preliminary planning: expected on 09.05.2022 within 5 working days until probably 13.05.2022

Preparation of work schedule: expected on 16.05.2022 within 32 working days until probably 24.06.2022

Release of work planning (by Architket): expected on 27.06.2022 within 11 working days until probably 08.07.2022

Production of built-in furniture: expected on 11.07.2022 within 36 working days until probably 19.08.2022

Installation of built-in furniture level -1 to level 3: expected on 22.08.2022 within 52 working days until probably 21.10.2022

Complete completion of built-in furniture: within 145 working days after the start of planning mentioned above, probably until 21.10.2022

VOB: Security for the fulfillment of the contract is in the amount of 5%. H. the order amount (including sales tax, excluding supplements), provided that the order amount is at least 250,000 euros excluding sales tax.

VOB: The security to be provided for claims for defects is 3% of the settlement sum (including sales tax) including any supplements issued. Time of return for unutilized security for claims for defects (Section 17 (8) no. 2 VOB/B): ./. years

VOB: Contractual penalties (§ 11 VOB / B)

If the specified individual deadlines or the deadline for completion are exceeded, the contractor must pay as a contractual penalty for each working day of the delay: 0.1%. H. the order amount stated in the order letter excluding sales tax; Amounts for offered maintenance services are not taken into account. The reference value for calculating the contractual penalty if individual deadlines agreed as contractual deadlines are exceeded is that part of this order amount that corresponds to the services to be contractually provided up to this point in time. The contractual penalty is increased to a total of 5 percent. H. of the order amount stated in the order letter (excluding sales tax).

Forfeited contractual penalties for the delay due to non-compliance with individual deadlines agreed as a contractual deadline will be counted towards a contractual penalty for the delay due to non-compliance with the deadline for completion of the service.

Approx. 35 m wooden wall handrail with integrated lighting

Built-in furniture storerooms, foyer

Lot 4:

3 pcs. Furnishing various work and storage rooms with built-in furniture

1 wardrobe element

8 dividing walls in lock rooms

1 sliding door system for chair storage

1 reception desk

approx. 70 m built-in wardrobes Hallway niches

approx. 24 m wall shelves

Single deadlines:

Start of preliminary planning: probably on 09.05.2022

Preparation of preliminary planning: expected on 09.05.2022 within 5 working days until probably 13.05.2022

Preparation of work schedule: expected on 16.05.2022 within 32 working days until probably 24.06.2022

Release of work planning (by Architket): expected on 27.06.2022 within 11 working days until probably 08.07.2022

Production of built-in furniture: expected on 11.07.2022 within 36 working days until probably 19.08.2022

Installation of built-in furniture level -1 to level 3: expected on 22.08.2022 within 52 working days until probably 21.10.2022

Complete completion of built-in furniture: within 145 working days after the start of planning mentioned above, probably until 21.10.2022

VOB: Security for the fulfillment of the contract is in the amount of 5%. H. the order amount (including sales tax, excluding supplements), provided that the order amount is at least 250,000 euros excluding sales tax.

VOB: The security to be provided for claims for defects is 3% of the settlement sum (including sales tax) including any supplements issued. Time of return for unutilized security for claims for defects (Section 17 (8) no. 2 VOB/B): ./. years

VOB: Contractual penalties (§ 11 VOB / B)

If the specified individual deadlines or the deadline for completion are exceeded, the contractor must pay as a contractual penalty for each working day of the delay: 0.1%. H. the order amount stated in the order letter excluding sales tax; Amounts for offered maintenance services are not taken into account. The reference value for calculating the contractual penalty if individual deadlines agreed as contractual deadlines are exceeded is that part of this order amount that corresponds to the services to be contractually provided up to this point in time. The contractual penalty is increased to a total of 5 percent. H. of the order amount stated in the order letter (excluding sales tax).

Forfeited contractual penalties for the delay due to non-compliance with individual deadlines agreed as a contractual deadline will be counted towards a contractual penalty for the delay due to non-compliance with the deadline for completion of the service.

Approx. 35 m wooden wall handrail with integrated lighting

Download full details as .pdf
The Buyer:
Zentrale Auftragsvergabestelle des Landkreises Darmstadt-Dieburg für den Eigenbetrieb Kreiskliniken Darmstadt-Dieburg
CPV Code(s):
45262670 - Metalworking
45262700 - Building alteration work
45421000 - Joinery work
45421131 - Installation of doors
45421153 - Installation of built-in furniture
45432210 - Wall-covering work
45441000 - Glazing work