General contractor services (provision of all construction services, including partial gutting and remediation of hazards and pollutants for restoration)
the use of all apartments and commercial areas, taking into account the requirements of the monument authorities.
1. Demolition and remediation work of hazardous and pollutant building materials and products:
Dismantling and disposal of, among others:
approx. 4,800 m² GK lightweight walls incl. KMF insulation, asbestos-containing filler and proportionate fire protection panels in the shaft walls of the bathrooms and kitchens
approx. 9,750 m² asbestos-containing fillers on solid walls of residential floors and staircases
approx. 2,700 m² tile coverings and asbestos-containing ceramic tile adhesives
approx. 5,300 m² asbestos-containing floor coverings and adhesives
approx. 1,500 m KMF insulated pipelines up to DN 300 mm (insulation)
approx. 2,200 m asbestos cement pipes up to DN 150 mm
ca. 2.800 m² Akustikdeckenplatten
approx. 290 bathroom objects (bathtub, washbasin, toilet)
approx. 180 pieces radiator
approx. 50 pieces of ceiling lights for reuse
approx. 245 room/apartment doors for reuse
• Damaged screed areas as required
• Gas and plumbing installation, ventilation system and partial heating (bathroom lines)
• electrical installation
2. Provision of all construction work after partial gutting for the restoration of the use of all apartments, ancillary areas (floor corridors, stairwells, etc.) as well as commercial areas of building A, Dominicusstrasse 37 and 39 with monument authority requirements
- consisting of 94 residential units and 6 commercial units on the ground floor
- Living space : approx. 4,774 m²
- Commercial space: approx. 1,924 m²
- Bruttogeschoßfläche: approx. 10,309.65 m²
Number of floors: 6 upper floors+ground floor
Bauhauptleistungen:
• concrete and masonry work;
• screed and flooring work;
• Painting and wallpapering in all homes and commercial areas
• Redesign of the stairwells, vestibules and corridors according to the colour concept (new painting, new flooring in the corridors if necessary)
• Drywall work (e.g. walls, ceilings, shafts, enclosures)
• tiling
• Renewal or revision of doors
• roof waterproofing work, roof drainage work
• roof insulation
• Repair of roof terraces and balustrades/defences
• repair or renewal of windows and window door systems
• Repair of damaged parapet elements
• Production of new smoke protection doors to the elevator vestibules
• Upgrading of fire and smoke protection doors, securing of escape routes in accordance with fire protection concept
Building services:
• Renewal of all technical building equipment
• Heating: only bathroom and kitchen lines
• Renewal of ventilation systems
• Renewal of the electrical installations in the residential areas, commercial areas and common areas with centralisation of the meter stations for tenants and commercial tenants and renewal of UV WE and commercial
The execution of the services under monument preservation specifications.
Prior to this, pollutant remediation work must be carried out in the commercial sector. The tradespeople will have moved out at the time of the renovation. The duration of the renovation of the individual commercial units is to be reduced to a maximum of four weeks. A maximum period of four months is to be planned for the overall renovation of the commercial units