Lot 45 - outdoor facilities.
The University and Hanseatic City of Greifswald plans to build the new Center for Life Science and Plasma Technology (Z4LP) within the city limits. For this purpose, an existing parking space is cleared and prepared for the upcoming new building.
This includes:
Floor work:
Remove and dispose of soil: 745 m
Delivery and installation of filling floor: 275 m
Cancellation:
coverings:
Pick up and store concrete pavement: 175 m
Break off and dispose of concrete slabs: 40 m
Pick up and dispose of base layers: 30 m³
Break off and dispose of concrete angled supports: 19 m
Break off and dispose of concrete curb: 45 m
Preparing the terrain surface:
Remove and dispose of sward and vegetal cover: 220 m
Provisional:
Dismantle and dispose of wooden ramps and stairs: 6 pcs.
Dismantle and dispose of the wooden platform: 1 pc.
Dismantle and dispose of wooden housing: 1 pc.
Break off and dispose of concrete protective layer (reinforced): 95 m
new building:
Fixed surfaces:
Delivery and laying of concrete paving: 1 150 m
Concrete pavement, existing laying: 175 m
Delivery and installation of asphalt pavement: 500 m
Asphalt pavement for ramp, delivery and installation in two layers: 310 m
Lane marking as a restricted area: 12 m
Delivery and installation of frost protection and base layer: 600 m³
Delivery and installation high board: 150 m
Delivery and installation low side: 330 m
Delivery and installation of hollow stone: 155 m
Delivery and installation of a root bridge: 10 m
Building constructions:
Delivery and installation of wall panels: 45 m
Delivery and installation of block steps: 90 m
Delivery and installation of concrete palisades: 12 pcs.
Sewage systems:
Create a pipeline trench: 120 m
Delivery and installation of the drainage pipe: 120 m
Delivery and installation of box channels: 110 m
Regulate manhole covers: 18 pcs.
Install manhole covers: 10 pcs.
Delivery and installation of inspection shaft: 1 pc.
Heavy current systems:
Creating a cable trench: 315 m mast lights delivery and installation: 12 pcs.
Delivery and installation of wall lights: 3 pcs.
Delivery and installation of bollard lights: 1 pc.
Install bollard lights, existing: 2 pcs.
Delivering and installing railing lights: 3 pcs.
Equipment:
Smoking pavilion, existing installation: 1 pc.
Bicycle stand brackets, existing install: 14 pcs.
Delivery and installation of barrier posts: 1 pc.
Delivery and installation of barriers: 3 pcs.
Delivery and installation of the waste container: 1 pc.
Waste bin, existing install: 3 pc.
Delivery and installation of benches: 2 pcs.
Delivery and installation of stools: 16 pcs.
Delivery and installation of signs: 8 pcs.
Signs, existing install: 1 pc.
Delivering and installing railing: 75 m railing, existing installation: 11 m Handrail supply and installing: 115 m Top floor work:
Delivery and installation of topsoil: 170 m
Create tree pits: 5 pcs.
Deliver and plant trees: 5 pcs.
Prepare planting areas: 435 m
Delivering and planting perennials and grasses: 3 285 pcs.
Completion and development care for 2 years of lawn:
Prepare lawns: 345 m
Delivery and installation of the drainage system structure: 155 m
Delivery and installation of steel band edging: 54 m of facade gutter delivery and installation: 51 m of base course delivery and installation: 9 m³ of granite slab covering delivery and installation: 120 m