Revitalization upVA München-VE 27_Refurbishment of stairwells in 5 stations — Lots 1 to 5.
Lot 1 — Repair — TRH MHTLot 1:
— construction site equipment 200 m
— dismantling 232 pieces,
— scaffolding 570 m
— protective measures 500 m
— cleaning of natural stone walls, parapets 1 620 m
— Wall repairs 2 000 m
— anti-grafitti coating 1490 m
— cleaning natural stone floors, stairs 550 m
— stair marking 80 m
— repairs floor 130 m
— waterproofing floor 350 m
— cleaning staircase enclosure 600 m
— inside/outside escalators 460 m,
— Cleaning metal ceiling 1 050 m
Lot 2:
— construction site facility 80 m
— dismantling 95 pieces,
— Scaffolding 340 m
— protective measures 290 m
— cleaning natural stone walls, parapets 1 430 m
— Wall repairs 1 700 m
— Anti-grafitti coating 730 m
— cleaning natural stone floors, stairs 220 m
— stair marking 60 m
— repairs floor 52 m
— waterproofing floor 220 m
— cleaning staircase enclosure 760 m
— inside/outside escalators 216 m,
— Cleaning metal ceiling 350 m
Lot 3:
— construction site equipment 60 m
— dismantling 95 pieces,
— scaffolding 120 m
— protective measures 520 m
— cleaning natural stone walls, parapets 452 m
— Wall repairs 600 m
— Anti-grafitti coating 440 m
— cleaning natural stone floors, stairs 80 m
— stair marking 13 m
— repairs floor 17 m
— waterproofing floor 80 m
— cleaning staircase enclosure 160 m
— inside/outside escalators 100 m,
— Cleaning metal ceiling 250 m
— painting wall 10 m
— painting ceiling 60 m
— Painting doors 1 piece.
Lot 4 — Repair — TRH MITLot 4:
— construction site equipment 120 m
— dismantling 232 pieces,
— scaffolding 245 m
— protective measures 1260 m
— cleaning natural stone walls, parapets 780 m
— Wall repairs 700 m
— Anti-grafitti coating 320 m
— cleaning of natural stone floors, stairs 355 m
— stair marker 25 m
— repairs floor 105 m
— waterproofing floor 355 m
— cleaning staircase enclosure 1900 m
— Inside/outside escalators 120 m,
— Cleaning metal ceiling 350 m
— escalator under-view 50 m
— Painting ceiling 460 m
— Painting doors 16 pieces.
Lot 5 — Repair — TRH MRPLot 5:
— construction site equipment 60 m
— dismantling 232 pieces,
— scaffolding 245 m
— protective measures 130 m
— cleaning natural stone walls, parapets 110 m
— Wall repairs 130 m
— Anti-grafitti coating 90 m
— cleaning natural stone floors, stairs 70 m
— step marking of fixed staircase 14 m
— repairs floor 10 m
— waterproofing floor 70 m
— cleaning staircase enclosure 350 m
— Inside/outside escalators 210 m,
— Cleaning metal ceiling 300 m