The construction project includes the fire protection renovation and the repair of house 2 on the property Charlottenburger Chaussee 67/75, 13597 Berlin. The work is associated with the change of use of the building from accommodation rooms to closet rooms. Existing office and training rooms remain unchanged in use. The installations in the electrical sector also include the provisions for a later use of all rooms as office and training rooms.
As part of the fire protection renovation and repair in house 2 of the property Charlottenburger Chaussee 67/75, 13597 Berlin, the following services are advertised:
Installation of a fire alarm system according to DIN 14675-1, DIN EN 54 and DIN VDE 0833 consisting of the following elements, among others:
- Fire alarm panel with F30 cabinet, - Fire brigade control panel FBF, - Fire brigade display panel FAT, - Fire brigade information system, - Fire brigade key depot FSD with activation element (FSE), - 175 automatic fire detectors, - 65 automatic fire detectors with signaling device, - 80 parallel displays, - 45 hand-held fire alarms, - 40 acoustic signaling devices, - 2 optical audible signaling devices, - 2,700 m fire alarm cable, - 850 m fire alarm cable E30, - 450 m of electrical conduit, parameterization, commissioning, sound level measurement, training/instruction, expert acceptance, documentation;
as well as access control systems:
- 100 m installation cable J-H(St)H or data cable Cat. 7A, - 2 pcs. access control system made by nedap Technology Partner [nTp] for Security Management GmbH, - 2 pcs. access control system made by GU BKS Service GmbH, documentation, support for users during commissioning.
The work is to be carried out in two successive construction phases.