Description:
23E60202 - New construction of the Stade tax office; Heating and plumbing work

Sanitary:

The Stade tax office will receive a cold water network with partly decentrally generated hot water, as well as a normal waste water system. The stainless steel piping system is flowed through and divided by means of flow dividers.

All pipes are insulated.

Quantities:

220 m sewage pipe soundproofed DN 50- DN 100

610 m stainless steel pipes up to DN 32

7 St Strömungsteiler

26 pcs toilet facilities

18 St Waschtischanlagen

9 St Urinalanlagen

1 pc handicapped accessible WC+WT facility

Heater:

The Stade tax office will receive a heat pump cascade with a total of 180kW to cover all radiators and

Ventilation units with 45/35°C.

The two parts of the building each have their own distributor from which the welded steel pipes

start.

In the elevated cavity floor, the heating pipes then run as plastic pipes to the

Valve radiators that are connected via the wall.

All pipes are insulated.

Quantities:

2 heat pumps per 90 kW

2 St Heizungsverteiler

1190 m welded steel pipe 1/2" to 2 1/2"

2850 m PE-X pipe 16mm to 50mm

4 St Gliederheizkörper

8 pcs convectors

41 St Vertikalheizkörper

304 pcs Panel radiator mainly type 22, 500mm high

Sanitary:

The Stade tax office will receive a cold water network with partly decentrally generated hot water, as well as a normal waste water system. The stainless steel piping system is flowed through and divided by means of flow dividers.

All pipes are insulated.

Quantities:

220 m sewage pipe soundproofed DN 50- DN 100

610 m stainless steel pipes up to DN 32

7 St Strömungsteiler

26 pcs toilet facilities

18 St Waschtischanlagen

9 St Urinalanlagen

1 pc handicapped accessible WC+WT facility

Heater:

The Stade tax office will receive a heat pump cascade with a total of 180kW to cover all radiators and

Ventilation units with 45/35°C.

The two parts of the building each have their own distributor from which the welded steel pipes

start.

In the elevated cavity floor, the heating pipes then run as plastic pipes to the

Valve radiators that are connected via the wall.

All pipes are insulated.

Quantities:

2 heat pumps per 90 kW

2 St Heizungsverteiler

1190 m welded steel pipe 1/2" to 2 1/2"

2850 m PE-X pipe 16mm to 50mm

4 St Gliederheizkörper

8 pcs convectors

41 St Vertikalheizkörper

304 pcs Panel radiator mainly type 22, 500mm high

Download full details as .pdf
The Buyer:
Land Niedersachen vertreten durch das Staatliche Baumanagement Niedersachsen
CPV Code(s):
45000000 - Construction work
45330000 - Plumbing and sanitary works