The building consists of a collector corridor, ground floor, first floor, second floor and usable for technical installation roof. The dimensions (external dimensions) are 23.52 x 66.68 x 14.80 m (WxLxH).
Production of the outdoor facilities for the building "Verbundleitstelle 2020":
The landscaping work is assigned demolition and earthworks, the production of paved areas and fence and gate systems, the equipment with benches, etc., and greening of outdoor facilities (plant delivery, planting, turfing, 1- and 2-year completion maintenance). In addition, ground and pipe laying work as well as the production of sewer manholes and infiltration systems are tendered.
Landscaping:
- 1 120 m
- 500 m
- 75 m
- 580 m
- 210 m security fence,
- 3 goals,
- 1 access point (electric turnstile),
- 6 benches,
- 10 bicycle rests,
- 1 pergola,
- 10 m screen,
- 40 access bollards,
- 75 m drainage channel,
- 8 street procedures,
- 130 m
- 110 m empty pipe,
- 11 foundation pipes,
- 8 high trunks,
- 400 m
- 1 450 m
- completion and development care.
Drainage:
- 1 750 m
- 355 m sewer DN 110 to DN 315,
- 13 concrete shafts DN 1000,
- 324 blocks of PP storage and infiltration system,
- 4 inspection pits PP DN 600,
- 355 meters of cleaning,
- optical inspection,
- Leak test and documentation sewer.