Construction work for elevated highways | Tenderlake

Construction work for elevated highways

Contract Value:
EUR 136M - 136M
Notice Type:
Contract Notice
Published Date:
01 December 2023
Closing Date:
29 January 2024
Location(s):
ITF63 Catanzaro (IT Italy/ITALIA)
Description:
CZ 48/23

S.S. 182 "Transversale delle Serre" Construction works of the 5th Section, Lot 4 and Lot 5 - from the Gagliato junction to the Soverato junction.

Definitive Project

CUP code: F81B23000330001

PARENT CATEGORY:

OG3 amount: € 46,134,717.89 Classification VIII not subject to use - subcontractable to the extent (maximum) of 50%, not further subcontractable. (Classification VIII with reference to the entire amount of the contract).

Uncordable categories:

OG10 amount: € 2,166,961.81 Classification IV, separable with mandatory qualification, subject to validation, fully subcontractable, not ult. subapp.

OG13 amount: € 4,706,701.16, Classification V, separable with mandatory qualification, subject to use, fully subcontractable, not ult. subapp.

OS1 amount: € 15,346,422.37, Classification VII, separable from non-compulsory qualification, subject to use, fully subcontractable, not ult. subapp.

OS8 amount: € 1,182,684.61, Classification III, separable from mandatory qualification, subject to validation, entirely subcontractable, not ult. subapp.

OS10 amount: € 169,514.38, Classification I, separable with mandatory qualification, subject to use, entirely subcontractable, not ult. subapp.

OS11 amount: € 2,407,996.51, Classification IV, separable with mandatory qualification, subject to use, entirely subcontractable, not ult. subapp.

OS12-A amount: € 4,035,913.03, Classification IV-bis, separable from mandatory qualification, subject to use, entirely subcontractable, not ult. subapp.

OS13 amount: € 5,102,552.96, Classification V, separable with mandatory qualification, subject to use, fully subcontractable, not ult. subapp.

OS18-A amount: € 20,376,895.02, Classification VIII, separable with mandatory qualification, S.I.O.S. not subject to use, as a work of significant technical complexity that can be entirely subcontracted, not ult. subapp.

OS21 amount: € 27,513,486.57, Classification VIII, separable with mandatory qualification, S.I.O.S. not subject to use, as a work of significant technical complexity that can be entirely subcontracted, not ult. subapp.

OS23 amount: € 192,347.48, Classification I, separable from non-mandatory qualification subject to entirely subcontractable use, not ult. subapp.

(All amounts include security charges)

Classes and categories of works to be designed:

S.04 (IX/b): amount of the works to be designed € 49,542,391.50; design fee € 677,252.04;

S.05 (IX/b IX/c): amount of the works to be designed € 18,736,653.64; design fee € 329,771.53;

S.03 (I/d): amount of the works to be designed € 21,528,095.72; design fee € 337,420.48;

IA.03 (III/c): amount of works to be designed: € 1,270,133.16; design fee € 35,089.40;

V.03 (VI/b): amount of the works to be designed € 29,878,111.72; design fee € 228,076.57;

P.1: amount of the works to be designed € 4,605,177.89; Fee for the design € 51,113.93.

Estimated units for the executive design: n. 40.

Nature and extent of performance

Bodywork net of labour costs: Amount € 60,138,952.28

Custom-made works net of labour costs: Amount € 44,319,421.24

Security charges: Amount: € 3,775,630.16

Technical expenses for executive design: Amount: € 1,658,723.95

PMA before and in progress net of labour costs: Amount: € 462,692.77

PMG net of labour costs: Amount: € 1,225,190.86

Reclamation of War Ordnance net of labour costs: Amount: € 537,574.52

Total labour costs: Amount: € 23,580,756.66.

With regard to the limits on subcontracting, please refer to the tender documentation.

Download full details as .pdf
The Buyer:
ANAS S.p.A.
CPV Code(s):
45233131 - Construction work for elevated highways